The Pelican Grand Resort
Commercial  /  The Pelican Grand Resort

Complicated Remodeling

The Pelican Grand Resort in Fort Lauderdale presented a complicated phased remodeling project for Beck Concrete: installing the concrete and masonry shell for the 1st floor addition and extensive remodeling of the 11th and 12th floors. This included the installation of a 2-inch-thick slab on high density foam. Beck Concrete successfully delivered on this challenging…

Learn More
Titan America Dust Shuttling
Industrial  /  Titan America Dust Shuttling

Delivering Immediate Results

When Titan America Dust Shuttling in Miami needed to implement additional capacity at a crucial manufacturing facility, Beck Concrete was contacted to deliver this fast paced project. The facility was located in an active mine quarry and therefore subject to Mine Safety and Health Administration regulations. Beck Concrete took immediate action to certify the entire…

Learn More
The Norton Museum of Art
Commercial  /  The Norton Museum of Art

More than Concrete

The Norton Museum of Art in West Palm Beach turned to Beck Concrete to meet the demands of a phased renovation construction project. With one simple coordinated contract, we consolidated the excavation, concrete, miscellaneous metals, and masonry scope of work. Based on these efforts, Beck is consulting with the design team and providing recommendations as…

Learn More
Veterans Affairs Hospital
Healthcare  /  Veterans Affairs Hospital

Repeat Customers

After delivering superior results on the first phase of construction with the Veterans Affairs Hospital in Miami, Beck Concrete was awarded the second phase in a cooling tower wall replacement project. We enhanced the concrete waterproofing capabilities using a Xypex admixture. In this second phase, Beck is using mechanical rebar couplers and a complicated shoring…

Learn More
Macy’s at the Aventura Mall
Commercial  /  Macy’s at the Aventura Mall

Problem Solvers

Facing a demolition-build addition to Macy’s at the Aventura Mall, Beck Concrete was tasked with creative problem solving. The parking lot needed to be removed and, in its place, a new building pad poured before construction could begin. Working with the client, Beck Concrete packaged services to efficiently meet the needs of the general contractor….

Learn More